Permitting

Applicability, analysis, and the documents you submit.

From the first applicability call to the forms you submit, RegPermit drafts the permitting record and cites every rule it leans on.

What you can do

  • Determine federal applicability — NSPS, NESHAP, Title V, PSD/NSR, GHGRP
  • Run a top-down BACT / RBLC analysis
  • Net a project for PSD/NSR and classify a modification’s significance
  • Draft the application narrative and QC a package for completeness
  • Respond to a notice of deficiency (NOD/RAI)

Fill the forms

Point the assistant at the real agency form — EPA, NM, TX, UT, CO — and it fills each field from the project record and hands back a downloadable PDF.

Try it

Example prompt

Does NSPS Subpart Dc apply to a new 95 MMBtu/hr natural-gas boiler?